Shut off the cooling water and power to the 9600, move the pump connection to one of the OMNI® outputs, then connect power, cooling water, and the helium lines. Start the compressor and restart the pump. The video on this page shows the steps on a live test setup, so your team can see what the changeover looks like before planning it.